The DG can be positioned inside the hall only if the area has proper ventilation on all four sides. There should be a minimum clearance of 2 meters around the generator to allow safe operation and easy maintenance. Additionally, the ceiling height above the DG should be at least 12 feet to ensure proper ventilation and safe working conditions.
Delivery will be made within 3 working days after receiving full payment.
A 15 kVA DG consumes approximately 3 liters of fuel per hour at 80% load.
No, it is not advised to connect a heater load to the DG. The requirement depends on the location; heaters are usually unnecessary in hottest cities and air conditioners may not be necessary in hill stations.
It is not recommended to purchase a DG for short-term use. For construction purposes, renting a DG is more cost-effective
No, it is not advisable to go for a 125kVA DG so soon, as it would be a waste of money.
AMF uses contactors and relays to control the DG automatically. ATS is a ready-to-use branded switch for automatic power transfer.
Installation means setting up electrical arrangements, including output cabling, termination, earthing and fixing the changeover switch with wiring.
Commissioning is when the DG is properly connected to the load and tested for operation.
Proper commissioning of a DG typically requires around 8 hours.
A single-phase DG is needed when customers use 230V equipment.
No, the cost of a single-phase DG is higher compared to a three-phase DG.
It is not advisable to use a DG for welding purposes.
Fuel consumption can be calculated using a formula, but generally, a 25kVA DG consumes around 5 liters per hour at 80% load.
A 15kVA DG requires three earthings: one for neutral and two for body earthing.
It is not advisable to keep a DG on the terrace. If there is no other option, it can be placed there, but safety certification may not be granted.
No, it is not possible.
No, payment is accepted only through online mode.
No, 100% payment must be made before dispatch.
Yes, we provide finance assistance to our customers.
Documents required include KYC, last three years’ Income Tax Returns and bank statements.
Yes, we offer a buyback option for old DGs.
No, unloading should be done only with a crane by skilled workers.
Yes, we can supply a trolley along with DG sets.
A single-axle, two-tyre trolley is required for a 25kVA DG.